Previous Residential Projects

 

The Neptune Building – Dun Laoghaire

The Neptune Building is a six-storey block of 197 apartments over a semi-basement car park. The block consists of 11 No cores with a combination of one, two and three bedroom apartments. The electrical scope of works comprised the electrical fitout of all apartments and the electrical installation of all common areas in the 11 No cores and basement carpark. The project is currently underway with a completion date of December 2016.

 alt

Client: Cosgrave Developments
Architect: McCrossan O Rourke Manning Architects
Consultant: McElligott Consulting Engineers
Main Contractor: Cosgrave Developments
Contract Value: €1,500,000

 

Bracken Park Residential Development - Castleknock

Bracken Park is a high quality suburban residential development and is located off the Carpenterstown Road, Dublin 15, in the western suburbs of Dublin. The Development consists of approximately 81 No houses and 70 No apartments located in 3 No Apartment Blocks. The electrical scope of works comprised the electrical fitout of all houses and apartments and the electrical installation of all common areas in the 3 No apartment blocks. The project was completed between January 2014 and March 2016.

 alt

Client: Cosgrave Developments
Architect: James Toomey Architects
Consultant: McElligott Consulting Engineers
Main Contractor: Cosgrave Developments
Contract Value: €950,000

 

Annamore Court - Chapelizod

The project is the construction of a new residential apartment complex on Chapelizod Hill Road, Dublin 20. 2 No existing two storey buildings will be renovated and two additional floor will be added to these buildings. A new four storey extension will also be constructed. The site will consist of 70 No one bedroom apartments, a laundry room, a guest room, a nurses office, an Estate Office, a Community room and a Plantroom. The project is currently underway with a completion date of February 2017.

 alt

Client: The Iveagh Trust
Architect: Edward Brady & Associates
Consultant: JWHA Consulting Engineers
Main Contractor: GEM Construction
Contract Value: €600,000

 

Ardilea Crescent Residential Development – Clonskeagh

Ardilea Crescent a unique parkland development of luxurious homes located in Ardilea, Clonskeagh. Phase 1 of the development consists of 26 No large four and five bedroom houses. Phase 2 of the development consists of 48 No high quality apartments in two Blocks. The scope of works for Phase 1 comprises the electrical fitout of all houses. Phase 1 of the project is currently underway with a completion date of June 2016.

 alt

Architect: McCrossan O Rourke Manning Architects
Consultant: MANDE Consulting Engineers
Main Contractor: O’Malley Construction Company
Contract Value: €275,000

 

Lissadell House – 9 Shrewsbury Road

The project was the redevelopment of the existing dwelling at No 9 Shrewsbury Road from 4,000ft2 to circa 10,000ft2 including a full internal refurbishment and the construction of a new basement and an extension to the side and the rear of the house. The new building consists of a basement, ground floor, 1st floor and 2nd floor. The scope of works for the electrical services include switchgear installation, lighting & external lighting installation, general power installation, TV, Phone & Data installation, fire alarm installation and security installation. The installation was completed between May 2015 and March 2016.

alt

Architect: Crean Salley Architects
Consultant: Coakley McElligott Limited
Main Contractor: GEM Construction
Contract Value: €382,000

 

Thormanby Hill Residential Development - Howth

Thormanby Hill is a high quality residential development of 27 No 5 Bedroom detached luxurious homes located in Thormanby Hill, Howth. The project is currently underway with a completion date of December 2016.

alt

Architect: McCrossan O Rourke Manning Architects
Consultant: McElligott Consulting Engineers
Main Contractor: Cosgrave Developments
Contract Value: €250,000

 

Chelmsford Manor Residential Development – Celbridge

Chelmsford Manor residential development in Celbridge comprises 57 No three and four bedroom detached, semi-detached and terraced energy efficient homes. The project was completed between September 2014 and April 2016.

alt

Client: Montane Developments
Architect: Duignan Dooley Architects
Main Contractor: Montane Developments
Contract Value: €250,000

 

Argus House – 59 Terenure Road East

The project was the redevelopment of the existing dwelling at Argus House, 59 Terenure Road East. No 9 Shrewsbury Road including a full internal refurbishment and the construction of new extensions. The new building consists of a basement, ground floor and 1st floors. The scope of works for the electrical services include switchgear installation, lighting & external lighting installation, general power installation, TV, Phone & Data installation, fire alarm installation and security installation. The installation was completed between May 2015 and March 2016.

alt

Architect: Brazil Associates
Consultant: Johnston Reid & Associates
Main Contractor: Wallace Contracting
Contract Value: €450,000

 

142 Georgian Village - Castleknock

The project was the construction of a new high end domestic type installation in Georgian Village, Castleknock. The scope of works comprised distribution board, lighting installation, general power installation, TV & Phone installation, fire detection installation and security installation. The installation was completed between January 2015 and June 2015.

alt

Consultant: KMCE Engineering Ltd
Main Contractor: Glengav Construction
Contract Value: €100,000

 

147 Dublin Road - Sutton

The project was the construction of a new high end domestic type installation in 147 Dublin Road, Sutton. The scope of works comprised distribution board, wiring of lighting installation, general power installation, TV & Phone installation, fire detection installation, lighting dimming system and security installation. The installation was completed between November 2014 and June 2015.

alt

Architect: Demesne Architects
Consultant: Johnston Reid & Associates
Main Contractor: Mark Fitzpatrick & Sons Ltd
Contract Value: €47,000

 

Loyola House – 87 Eglinton Road

This high end domestic type project consisted of the complete refurbishment of a prominent 4 storey house that is located at the junction of Sandford Road and Eglinton Road in Dublin 4. The scope of works for the electrical services include switchgear installation, lighting & external lighting installation, general power installation, TV, Phone & Data installation, fire alarm installation, security installation, multi room speaker system and AV systems. The installation was completed between February and August 2013.

alt

Architect: Fitzgerald Kavanagh and Partners Architects
Consultant: Coakley McElligott Limited
Main Contractor: GEM Construction
Contract Value: €210,000

 

Ceanchor Road - Howth

The project was the construction of a new high end domestic type installation in Ceanchor Road Howth. The scope of works comprised distribution board, lighting & external lighting installation, general power installation, TV & Phone installation, fire detection installation and security installation. All light fittings were supplied by the client. The installation was completed between March and November 2013.

alt

Architect: Tyler Owens Architects
Consultant: Ramsay Cox & Associates
Main Contractor: Halton Construction
Contract Value: €65,000

 

Banyul – Proby Square Blackrock

The project was the construction of a new high end domestic type installation in Proby Square Blackrock. The scope of works comprised distribution board, lighting & external lighting installation, general power installation, TV & Phone installation and security installation. All light fittings were supplied by the client. The installation was completed between September 2014 and May 2015.

alt

Architect: Dermot Bannon Architects
Main Contractor: Halton Construction
Contract Value: €48,000

 

No 7 The Paddocks - Dalkey

The project was the construction of a new high end domestic type installation in The Paddocks Dalkey. The scope of works comprised distribution board, lighting & external lighting installation, general power installation, TV & Phone installation, electric heating mats and security installation. All light fittings were supplied by the client. The installation was completed between May and September 2012.

alt

Consultant: Johnston Reid & Associates
Main Contractor: Halton Construction
Contract Value: €35,000

 

Hill Street Apartments

The project was the construction of a new Building on Hill Street, Dublin 1, consisting of 11 apartments and one Commercial Unit. The apartments are located between the ground floor and the third floor and there is also a basement carpark. The electrical services installation was completed by Alfa Electrical Ltd between January 2011 and June 2011.

alt

Consultant: Dervan Engineering Consultants
Main Contractor: Moston Building & Civil Engineering
Contract Value: €70,000

 

Previous Commercial Projects

 

Murphy International Head Office

The project was the construction of a new flagship two storey headquarters for Murphy International at Great Connell, Newbridge Co. Kildare. The new building was constructed and managed by Murphy’s own construction team. The electrical scope of works comprised switchgear, lighting & emergency lighting, fire alarm system, general services, data installation and security installation. The project was completed between January 2015 and June 2015.

alt

Client: Murphy Intermational Ltd
Consultant: Coakley McElligott Limited
Main Contractor: Murphy Intermational Ltd
Contract Value: €242,000

 

The Harcourt Centre

The Harcourt Centre is a 7 storey office building on Harcourt Street, Dublin 2. The project was the refurbishment of a number of tenant and landlord areas in Block 2 and Block 3 of The Harcourt Centre. The electrical scope of works comprised switchgear, lighting & emergency lighting, fire alarm system, general services and access control installation. The project was completed between July 2014 and October 2014.

alt

Client: IPUT
Architect: MCA Architects
Consultant: Coakley McElligott Limited
Main Contractor: PHD Construction
Contract Value: €290,000

 

C&D Foods Mullingar – European HQ Office Fitout

The project was the fitout of the new head offices for C&D Foods in Marlinstown, Mullingar. The building consists of numerous cellular offices, open plan office area, conference room, reception area, comms room, staff canteen and toilets. The electrical scope of works comprised switchgear, lighting & emergency lighting, fire alarm system, general services, data installation and intruder alarm installation. The installation was completed between October 2013 and January 2014.

alt

Client: C&D Foods
Architect: Arcology Design Ltd
Consultant: Noel Lawler Consulting Engineers
Main Contractor: GEM Construction
Contract Value: €130,000

 

189 – 190 Pearse Street – Trinity College Dublin

189 – 190 Pearse Street is part of the Trinity College Campus in Dublin City Centre. The project consists of the refurbishment to the existing two buildings inclusive of strip out / modifications to the existing electrical services and installation of new electrical services. The buildings shall be utilised for some on-site storage, office areas and welfare facilities comprising toilets, showers, dry room and locker rooms. The project was completed between August 2015 and October 2015.

alt

Client: Trinity College Dublin
Consultant: RPS Engineers
Main Contractor: GEM Construction
Contract Value: €100,000

 

The Harcourt Centre – Block 2

The Harcourt Centre is a 7 storey office building on Harcourt Street, Dublin 2. The project was the refurbishment of the ground floor tenant area 1 and 2nd floor tenant area 1 in Block 2. The electrical scope of works comprised switchgear, lighting & emergency lighting, fire alarm system, general services and access control installation. The project was completed between July 2015 and September 2015.

alt

Client: IPUT
Consultant: MANDE Consulting Engineers
Main Contractor: Dartmouth Building Works
Contract Value: €70,000

 

Rockbrook Sandyford – Carpark Extension

The project was an extension of the existing car park at basement -1 level Rockbrook, Sandyford, Dublin 18. The scope of works comprised Switchgear, Cable Management, Lighting & Emergency Lighting, Fire Alarm System and disabled refuge system. The installation was completed between October and December 2013.

alt

Consultant: J.V. Tierney & Co
Main Contractor: PHD Construction
Contract Value: €60,000

 

St Michaels House New Training Centre

The project involved the refurbishment of the existing building at Unit 94A, Lagan Road, Glasnevin, Dublin 11 into a new training centre for St Michaels House. Alfa Electrical Ltd completed the Electrical Services Installation between December 2008 and February 2009.

alt

Client: St Michaels House
Architects: James Smyth Architects
Consultant: Clarke and Associates
Main Contractor: Flynn Management & Contractors
Contract Value: €70,000

 

Previous Banking Projects

 

Permanent TSB – Head Office

The scope of works consists of the upgrade of electrical services to the ground & first floor offices at PTSB Head Office Stephens Green. This included general power, lighting, emergency lighting, fire alarm and telecommunications. The installation was completed in August 2012.

alt

Client: PTSB
Main Contractor: PHD Construction
Contract Value: €15,000

 

Permanent TSB – SSBM Installations Nationwide

We completed the data and electrical wiring requirements for the installation of SSBM’s (self service balancing machines) in approximately 60 PTSB Branches nationwide. The installation was completed between March 2011 and February 2012.

alt

Client: PTSB
Main Contractor: Pierce Healy Developments / Halton Construction
Contract Value: €60,000

 

Permanent TSB - Athlone

The scope of works consists of main switchgear, cable management, general power, lighting, emergency lighting, fire alarm, telecommunications and wiring for mechanical services. The installation was completed between May 2010 and July 2010.

alt

Client: PTSB
Architect: Oppermann Associates
Consultant: Keaveny Engineering
Main Contractor: Pierce Healy Developments
Contract Value: €60,000

 

EBS Building Societies Nationwide

Electrical services fitout in a number of new and existing EBS Building Societies throughout the country. The scope of works varies from branch to branch but generally consists of general power, lighitng, emergency lighitng, fire alarm, storage heating, telecommunications and air conditioning

The following is a list of recent EBS installations:

  • EBS Building Society – Citywest Shopping Centre
  • EBS Building Society – Rathmines
  • EBS Building Society – Baggot Street
  • EBS Building Society – Killiney
  • EBS Building Society - Dundrum
  • EBS Building Society – Douglas, Cork
  • EBS Building Society – Dooradoyle, Limerick
  • EBS Building Society – Beacon South Quarter, Sandyford
  • EBS Building Society – Ennis, Clare

 

 alt

Client: EBS Building Society
Architect: MBK Architects
Consultant: T5 Partnership
Main Contractor: Halton Construction
Contract Values: €40,000 to €80,000

 

Previous Sports & School Projects

 

Marlay Park Golf Pavilion

The project was the construction of a new two storey golf pavilion at Marlay Park Golf Course. The lower ground floor consists of toilets, staff area, store rooms and a Plantroom and the upper floor consists of a seating area, kitchen, server, golf hire reception and circulation areas. The electrical scope of works comprised switchgear, lighting & emergency lighting, fire alarm system, general services, data installation and security installation. The electrical services installation was completed by Alfa Electrical Ltd between September 2013 and February 2014.

 alt

Client: Dun Laoghaire Rathdown County Council
Consultant: Ramsay Cox & Associates
Main Contractor: Moston Building & Civil Engineering
Contract Value: €50,000

 

Enniskerry Football Club

The project was the construction of a new building for Enniskerry Football Club. The building consists of changing rooms, showers, toilets, plant room, referee’s room and meeting room. The scope of works comprised Switchgear, Lighting & Emergency Lighting, Fire Alarm System, General Services, Intruder Alarm and Disabled Toilet Alarm. The installation was completed between October and December 2012.

alt

Client: Enniskerry Football Club
Consultant: Coakley McElligott Limited
Main Contractor: Cosgrave Developments
Contract Value: €35,000

 

Dun Laoghaire Bowls Club

The project was the construction of a new building for Dun Laoghaire Bowls Club. The building consists of reception area, locker rooms, toilets, kitchen and multi-purpose area. The scope of works comprised Switchgear, Lighting & Emergency Lighting, Fire Alarm System, General Services, Intruder Alarm and Intercom. The installation was completed between February and March 2012.

alt

Client: Dun Laoghaire Bowls Club
Consultant: Coakley McElligott Limited
Main Contractor: Cosgrave Developments
Contract Value: €30,000

 

Home Farm Football Club

The project was the refurbishment of the existing Bar, Changing Rooms and Shower Rooms at Home Farm Football Club. The scope of works comprised Switchgear, Cable Management, Lighting & Emergency Lighting, Fire Alarm System, General Services and Intruder Alarm. The installation was completed between April and July 2012.

alt

Client: Home Farm Football Club
Architect: Warren Architects
Consultant: Axis Engineering Consultants
Main Contractor: Halton Construction
Contract Value: €40,000

 

DCC Sports Pavilion – Le Fanu Park Ballyfermot

The project was the refurbishment of the existing DCC Sports Pavilion at Le Fanu Park, Ballyfermot. The Sports Pavilion consists of two blocks with new changing rooms, shower rooms and toilets and a third block which is a Scout Building. The scope of works comprised Switchgear, Lighting & Emergency Lighting, Fire Alarm System, General Services and Intruder Alarm. The installation was completed between May and June 2012.

alt

Client: Dublin City Council
Consultant: Glenn Nunan Consulting Engineers
Main Contractor: MJ Clarke & Sons Limited
Contract Value: €37,000

 

Scoil Muire Agus Iosef - Bayside

The existing electrical services installation was upgraded as part of the Summer Works Scheme 2011. The scope of works comprised Switchgear Installation, Cable Management System, Emergency Lighting Installation, Fire Alarm System Installation, General Lighting Installation and General Services Socket Outlets Installation. The installation was completed between July 2011 and August 2011.

alt

Client: Scoil Muire Agus Iosef
Consultant: J.V Tierney & Co
Contract Value: €100,000

 

Clontarf Golf Club – New Machinery Shed

The project was the construction of a new building at Clontarf Golf Club to house machinery, staff facilities and equipment wash. The new building was connected back to the existing Golf club building with power, data, telephone etc services. The electrical services installation was completed by Alfa Electrical Ltd between January 2011 and June 2011.

alt

Client: Clontarf Golf Club
Architect: Nolan & Quinlan
Consultant: J.V Tierney & Co
Main Contractor: Merrion Contracting
Contract Value: €50,000

 

Scoil Mologa, Charleville Road, Harolds Cross, Dublin 6

The upgrade of the electrical services installation in the main single storey school building and also 2 No prefabricated classroom blocks to the rear. This included a new lighting installation, new fire alarm system, emergency lighting installation, new general services socket outlets, CCTV system, PA system and Intercom system.

alt

Client: Scoil Mologa
Architect: Crean Sally Architects
Contract Value: €40,000

 

Previous Retail Projects

 

17 South William Street

The project was the renovation of an 18th century existing protected structure at 17 South William Street. The building consists of 4 floors over basement. The ground floor is retail space with treatment rooms, offices space and staff facilities in the floor above. The scope of works comprised Switchgear, Lighting & Emergency Lighting, Fire Alarm System, General Services & Data, Electric Heating, Security Systems & Disabled Call Systems. The installation was completed between June and September 2013.

alt

Client: Benefit Cosmetics
Architect: Robin Mandal Architects
Consultant: Johnston Reid & Associates
Main Contractor: GEM Construction
Contract Value: €85,000

 

Hanover Medical Centre

The project was the fitout of a new two storey Medical Centre in Dublin 2. The building consists of numerous consult rooms, nurses room, support room, reception area, plant room, staff room and toilets. The scope of works comprised Switchgear, Lighting & Emergency Lighting, Fire Alarm System, General Services & Data, Intruder Alarm and Intercom. The installation was completed between October and December 2012

alt

Client: Hanover Medical Centre
Architect: McCauley Daye O'Connell Architects Ltd
Consultant: Coakley McElligott Limited
Main Contractor: StructureTone Ltd
Contract Value: €48,000

 

Focus Ireland – 14A Eustace Street

The scope of works consists of the supply and installation of a new main distribution board, a new emergency lighting installation throughout the building and a new fire detection and alarm system installation throughout the building. The installation was completed in August 2010.

alt

Client: Focus Ireland
Consultant: Dervan Engineering Consultants
Contract Value: €20,000

 

Previous Energy Efficiency Projects

 

The Richmond Apartments – Lighting Upgrade

The project was the lighting upgrade of Block FGH and Block ABC of the Richmond Apartments, North Brunswick Street, Dublin 7. This included the installation of new energy efficient LED fittings in all corridor and stairwell areas, the upgrade of the carpark lighting and the installation of new emergency lighting. The installation was completed in August 2014 and July 2015.

alt

Client: Sherry Fitzgerald
Main Contractor: Alfa Electrical
Contract Value: €45,000

 

Carrigmore Crescent Apartment Complex – Lighting Upgrade

The project was a complete upgrade of the lighting installation in the common areas of 5 No blocks of Apartments and also the upgrade of the lighting installation in the underground carpark. All new light fittings were either energy efficient LED fittings or energy efficient T5 fluorescent fittings. The installation was completed in phases between March 2012 and January 2013.

alt

Client: Carrigmore Crescent Management Company
Property Management Co: Cuala Property Management
Contract Value: €45,000

 

Carrig Court Apartment Complex – Lighting Upgrade

The project was a complete upgrade of the lighting installation in the common areas of 4 No blocks of Apartments. All new light fittings were energy efficient LED light fittings. The installation was completed in March 2015.

alt

Client: Carrig Court Management Company
Property Management Co: Cuala Property Management
Contract Value: €15,000

 

Fitzwilliam Quay Apartment Complex – Lighting Upgrade

The project was an upgrade of the lighting installation in the common areas of 4 No blocks of Apartments. All new light fittings were energy efficient LED light fittings. The installation was completed in November 2013.

alt

Client: Fitzwilliam Quay Management Ltd
Property Management Co: Indigo Property Management
Contract Value: €14,000

 

Dean Court Apartment Complex – Lighting Upgrade

The project was an upgrade of the lighting installation in the common areas of a number of blocks of apartments at Dean Court Apartment Complex. All new light fittings were energy efficient LED light fittings. The installation was completed between October 2014 and November 2014.

alt

Client: Dean Court Management Patrick Street Ltd
Property Management Co: Cuala Property Management
Contract Value: €20,000

 

Previous Public House Projects

 

The Eden House Pub & Reeves Restaurant, Rathfarnham

The project consisted of the complete refurbishment of the Eden House Pub and Restaurant. The electrical installation works included general services, lighting, emergency lighting, fire alarm, intruder alarm and CCTV system.

alt

Client: Tony Lawless
Architect: Tim Kane
Main Contractor: Halton Construction
Contract Value: €140,000

 

The Glenside Public House - Churchtown

The project consisted of the refurbishment of the Glenside Pub in Churchtown. The electrical installation works included general services, lighting, emergency lighting, fire alarm, intruder alarm and CCTV system. The installation was completed in March 2015.

alt

Client: The Mangan Group
Architect: Frank Ennis & Associates
Contract Value: €25,000

 

The Morgue Public House, Templeogue Village

The project consisted of the complete refurbishment of the Morgue Public House in Templeogue Village. The electrical installation works included general services, lighting, emergency lighting, fire alarm, intruder alarm and CCTV system. The installation was completed in March 2015.

alt

Client: Tony Lawless
Architect: Stevenson Maguire Design
Contract Value: €35,000

 

 